Skip to content
TrailMath
Build my plan Dashboard Build my plan Dashboard

Race Time Predictor

How fast will you run Integrale?

Integrale race stats pre-loaded (62.6 km, 2,689 m D+). Enter a known race result to get an elevation-adjusted finish time estimate.

62.6km2,689m D+Winner: ~5h03Cutoff: 19h

62.6 kmdistance2,689 mD+2,716 mD-103km-effort
GentleSteadySteepVery steep
  1. Your race (done)
  2. About you
  3. Your finish

1Your race

IntegraleOfficial course loaded · 62.6 km · 2,689 m D+Different race?

Have the GPX? Measure the exact course in the GPX Explorer

  • The course

    62.6 km, but it costs 103 km-effort. The 2,716 m of descent is where legs go.

2How should we estimate you?

Start with

Pick whichever you have. After your first estimate we ask for the other - two inputs give a firmer read.

Same as gain. Edit if different.

Hours, or h:mm

From my Strava history (opens in a new tab)Your last 90 days of real training. Opens the TrailMath app.Read-only access to your activities. Nothing is posted to Strava, and no training plan is created until you ask for one.Powered by Strava
  • TrailMath

    Got a UTMB index? Hand it over, it's the straightest read I get. No index? A long, hilly past race works too.

3 · Your predicted finish

89 km-effort (ITRA, gain only)103 km-effort

Add a past race or your index to get a finish time.

Integrale finish times by UTMB Index

Predicted finish on the Integrale course (62.6 km, 2,689 m D+) for each UTMB Index, with the margin to the 19h00 cutoff.

Integrale: predicted finish time by UTMB Index
UTMB IndexPredicted finishAverage paceMargin to cutoff
8505h275:13 /km8:24 /mi+13h33
8005h575:42 /km9:11 /mi+13h03
7506h306:14 /km10:02 /mi+12h30
700competitive7h076:49 /km10:58 /mi+11h53
6507h477:27 /km12:00 /mi+11h13
6008h308:09 /km13:07 /mi+10h30
5509h178:54 /km14:20 /mi+9h43
500mid-pack10h099:44 /km15:40 /mi+8h51
45011h0610:38 /km17:07 /mi+7h54
400back of the pack12h0811:38 /km18:43 /mi+6h52
35013h1612:43 /km20:28 /mi+5h44
30014h3013:54 /km22:22 /mi+4h30

The 19h00 cutoff sits at about Index 148. The typical winning time, 5h03, sits at about Index 892. At the 2026 edition, the median of the 753 finishers took 9h42, about Index 526. A model estimate, not an official ITRA or UTMB figure.

From a result you already have

What the predictor gives on Integrale for a few common reference results.

Integrale: predicted finish from reference results
Road marathon3h00 → 8h573h30 → 10h274h00 → 11h564h30 → 13h26
50 km trail, 2,000 m D+5h30 → 7h296h30 → 8h517h30 → 10h138h30 → 11h34

Road marathons use the tool's rougher power-law fallback.

To prepare each checkpoint, use the Integrale aid station planner.

Integrale course in numbers

Climbing per kmClimbing per mile
43 m227 ft
ITRA km-effort
89 (50K)
Highest point
900 m2,953 ft
Biggest climb
+500 m over 3.8 km at 12.8% (through Ferme du Cade)+1,640 ft over 2.4 mi at 12.8% (through Ferme du Cade)
Steepest climb
+196 m over 1.3 km at 14.3%+643 ft over 0.8 mi at 14.3%
Longest descent
-254 m over 5.0 km at 4.9% (through Saint-Andre-de-Vezines)-833 ft over 3.1 mi at 4.9% (through Saint-Andre-de-Vezines)
Track climbing above 3%
36%
Winning time / cutoff
5h03 / 19h00 (3.8x the winner's time)

Section-by-section climbs, descents and grades are on the Integrale course page.

Predict your Integrale finish time from a reference race result, adjusted for the course's 62.6 km and roughly 2,689 m of elevation gain. The overall cutoff is 19h.

About Integrale des Causses

Integrale des Causses covers 62.6 km with around 2,689 m of elevation gain, starting in Peyreleau, France. The overall cutoff is 19 hours.

Crew access is allowed at Saint-Andre-de-Vezines (19.57 km).

Checkpoint data approximate - verify against the current official race guide at festivaldestempliers.com before your race.

How the prediction works

Your result becomes a UTMB Index, mapped onto Integrale by the calibrated model behind the ITRA / UTMB Index Estimator. Full methodology.

Build a training plan targeted at your Integrale goal time

TrailMath uses these models to build periodized plans adjusted to your goals and terrain.

Build my plan