Race Time Predictor
How fast will you run Montagn'Hard 100?
Montagn'Hard 100 race stats pre-loaded (102.1 km, 8,130 m D+). Enter a known race result to get an elevation-adjusted finish time estimate.
102.1km8,130m D+Winner: ~13h58Cutoff: 30h
Full La Montagn'Hard 100 course data: aid stations, cutoffs, course profile
- ✓Your race (done)
- 2About you
- 3Your finish
1Your race
- The course
102.1 km, but it costs 224 km-effort. The 8,130 m of descent is where legs go.
2How should we estimate you?
Start with
Pick whichever you have. After your first estimate we ask for the other - two inputs give a firmer read.
Same as gain. Edit if different.
Hours, or h:mm
- TrailMath
Got a UTMB Index? Hand it over, it's the straightest read I get. No index? A long, hilly past race works too.
3 · Your predicted finish
183 km-effort (ITRA, gain only)224 km-effort
Add a past race or your index to get a finish time.
Montagn'Hard 100 finish times by UTMB Index
Predicted finish on the Montagn'Hard 100 course (102.1 km, 8,130 m D+) for each UTMB Index, with the margin to the 30h00 cutoff.
| UTMB Index | Predicted finish | Average pace | Margin to cutoff |
|---|---|---|---|
| 850 | 14h07 | 8:18 /km13:21 /mi | +15h53 |
| 800 | 15h26 | 9:04 /km14:36 /mi | +14h34 |
| 750 | 16h52 | 9:55 /km15:57 /mi | +13h08 |
| 700competitive | 18h26 | 10:50 /km17:26 /mi | +11h34 |
| 650 | 20h09 | 11:51 /km19:04 /mi | +9h51 |
| 600 | 22h02 | 12:57 /km20:50 /mi | +7h58 |
| 550 | 24h05 | 14:09 /km22:47 /mi | +5h55 |
| 500mid-pack | 26h20 | 15:28 /km24:54 /mi | +3h40 |
| 450 | 28h47 | 16:55 /km27:13 /mi | +1h13 |
| 400back of the pack | 31h27 | 18:29 /km29:45 /mi | 1h27 past the cutoff |
| 350 | 34h23 | 20:12 /km32:31 /mi | 4h23 past the cutoff |
| 300 | 37h35 | 22:05 /km35:33 /mi | 7h35 past the cutoff |
The 30h00 cutoff sits at about Index 427. The typical winning time, 13h58, sits at about Index 856. At the 2026 edition, the median of the 168 finishers took 23h13, about Index 570. A model estimate, not an official ITRA or UTMB figure.
From a result you already have
What the predictor gives on Montagn'Hard 100 for a few common reference results.
| Road marathon | 3h00 → 23h11 | 3h30 → 27h02 | 4h00 → 30h54 | 4h30 → 34h46 |
|---|---|---|---|---|
| 50 km trail, 2,000 m D+ | 5h30 → 19h25 | 6h30 → 22h57 | 7h30 → 26h28 | 8h30 → 29h59 |
Road marathons use the tool's rougher power-law fallback.
To prepare each checkpoint, use the Montagn'Hard 100 aid station planner.
Montagn'Hard 100 course in numbers
- Climbing per kmClimbing per mile
- 80 m420 ft
- ITRA km-effort
- 183 (100M)
- Highest point
- 2,511 m8,238 ft
- Biggest climb between checkpoints
- +1,362 m over 7.2 km at 18.4% (from Start - Saint-Nicolas-de-Véroce)+4,469 ft over 4.5 mi at 18.4% (from Start - Saint-Nicolas-de-Véroce)
- Steepest climb
- +566 m over 2.4 km at 23.4%+1,857 ft over 1.5 mi at 23.4%
- Longest descent
- -1,147 m over 8.7 km at 12.3%-3,763 ft over 5.4 mi at 12.3%
- Track climbing above 3%
- 44%
- Winning time / cutoff
- 13h58 / 30h00 (2.1x the winner's time)
Section-by-section climbs, descents and grades are on the Montagn'Hard 100 course page.
Predict your Montagn'Hard 100 finish time from a reference race result, adjusted for the course's 102.1 km and roughly 8,130 m of elevation gain. The overall cutoff is 30h.
About La Montagn'Hard 100
La Montagn'Hard 100 covers 102.1 km with around 8,130 m of elevation gain, starting in Saint-Nicolas-de-Véroce, Saint-Gervais-les-Bains, France. The overall cutoff is 30 hours.
Crew access is allowed at L'Étape (20.7 km), Le Signal (27.6 km), Les Contamines (47.6 km) and Les Chattrix (88.6 km). Drop bags are available at Les Contamines.
Checkpoint data approximate - verify against the current official race guide at montagnhard.com before your race.
How the prediction works
Your result becomes a UTMB Index, mapped onto Montagn'Hard 100 by the calibrated model behind the ITRA / UTMB Index Estimator. Full methodology.
Build a training plan targeted at your Montagn'Hard 100 goal time
TrailMath uses these models to build periodized plans adjusted to your goals and terrain.
Build my plan