Skip to content
TrailMath
Build my plan Dashboard Build my plan Dashboard

Race Time Predictor

How fast will you run GGT 57?

GGT 57 race stats pre-loaded (57 km, 3,500 m D+). Enter a known race result to get an elevation-adjusted finish time estimate.

57km3,500m D+Winner: ~6h25Cutoff: 15h

57 kmdistance3,500 mD+4,000 mD-112km-effort
GentleSteadySteepVery steep
  1. Your race (done)
  2. About you
  3. Your finish

1Your race

GGT 57Official course loaded · 57 km · 3,500 m D+Different race?

Have the GPX? Measure the exact course in the GPX Explorer

  • The course

    57 km, but it costs 112 km-effort. The 4,000 m of descent is where legs go.

2How should we estimate you?

Start with

Pick whichever you have. After your first estimate we ask for the other - two inputs give a firmer read.

Same as gain. Edit if different.

Hours, or h:mm

From my Strava history (opens in a new tab)Your last 90 days of real training. Opens the TrailMath app.Read-only access to your activities. Nothing is posted to Strava, and no training plan is created until you ask for one.Powered by Strava
  • TrailMath

    Got a UTMB Index? Hand it over, it's the straightest read I get. No index? A long, hilly past race works too.

3 · Your predicted finish

92 km-effort (ITRA, gain only)112 km-effort

Add a past race or your index to get a finish time.

GGT 57 finish times by UTMB Index

Predicted finish on the GGT 57 course (57.0 km, 3,500 m D+) for each UTMB Index, with the margin to the 15h00 cutoff.

GGT 57: predicted finish time by UTMB Index
UTMB IndexPredicted finishAverage paceMargin to cutoff
8505h536:11 /km9:57 /mi+9h07
8006h256:46 /km10:53 /mi+8h35
7507h017:23 /km11:54 /mi+7h59
700competitive7h408:05 /km13:00 /mi+7h20
6508h238:50 /km14:13 /mi+6h37
6009h109:39 /km15:32 /mi+5h50
55010h0110:33 /km16:59 /mi+4h59
500mid-pack10h5711:32 /km18:34 /mi+4h03
45011h5912:36 /km20:17 /mi+3h01
400back of the pack13h0513:47 /km22:11 /mi+1h55
35014h1915:04 /km24:14 /mi+0h41
30015h3816:28 /km26:30 /mi0h38 past the cutoff

The 15h00 cutoff sits at about Index 323. The typical winning time, 6h25, sits at about Index 801. At the 2026 edition, the median of the 508 finishers took 11h40, about Index 464. A model estimate, not an official ITRA or UTMB figure.

From a result you already have

What the predictor gives on GGT 57 for a few common reference results.

GGT 57: predicted finish from reference results
Road marathon3h00 → 9h553h30 → 11h344h00 → 13h134h30 → 14h52
50 km trail, 2,000 m D+5h30 → 8h056h30 → 9h337h30 → 11h018h30 → 12h29

Road marathons use the tool's rougher power-law fallback.

GGT 57 course in numbers

Climbing per kmClimbing per mile
61 m324 ft
ITRA km-effort
92 (50K)
Highest point
2,673 m8,770 ft
Biggest climb between checkpoints
+1,429 m over 9.1 km at 14.7% (Start - Kals to Glorer Hütte)+4,688 ft over 5.7 mi at 14.7% (Start - Kals to Glorer Hütte)
Steepest climb
+631 m over 3.6 km at 17.3% (through Glocknerhaus)+2,070 ft over 2.2 mi at 17.3% (through Glocknerhaus)
Longest descent
-1,578 m over 11.9 km at 12.7% (down to Ferleiten)-5,177 ft over 7.4 mi at 12.7% (down to Ferleiten)
Track climbing above 3%
37%
Winning time / cutoff
6h25 / 15h00 (2.3x the winner's time)

Section-by-section climbs, descents and grades are on the GGT 57 course page.

Predict your GGT 57 finish time from a reference race result, adjusted for the course's 57 km and roughly 3,500 m of elevation gain. The overall cutoff is 15h.

About Grossglockner Ultra-Trail - Grossglockner Trail

Grossglockner Ultra-Trail - Grossglockner Trail covers 57 km with around 3,500 m of elevation gain, starting in Kals am Grossglockner, Austria. The overall cutoff is 15 hours.

Checkpoint data approximate - verify against the current official race guide at ultratrail.at before your race.

How the prediction works

Your result becomes a UTMB Index, mapped onto GGT 57 by the calibrated model behind the ITRA / UTMB Index Estimator. Full methodology.

Build a training plan targeted at your GGT 57 goal time

TrailMath uses these models to build periodized plans adjusted to your goals and terrain.

Build my plan