Skip to content
TrailMath
Build my plan Dashboard Build my plan Dashboard
Loch Ness down the Great Glen from Dores, Highlands, Scotland

Photo: Banja-Frans Mulder · CC BY 3.0 · cropped

All races Ultra X Scotland

Ultra X Scotland - 110 km course and race-day weather

Unofficial guide - not affiliated with the organiser

  • 110 km68.4 mi
  • 2,920 m9,580 ft D+
  • 10 aid stations
  • Queens Park Stadium, Inverness, Scotland, United Kingdom
Starts in ~5 months Sat, May 1, 2027 · 07:00 GMT+1 May 1, 2027 est.

Analyzing route...

Ultra X Scotland 110K course, section by section

The Ultra X Scotland 110K course runs 110.0 km with 2,920 m of climbing and 2,910 m of descent - 27 m of climbing per kilometre. It tops out at 434 m, and its lowest point on the GPX is 15 m. 29% of the distance climbs at more than 3%, 28% descends at more than 3%, and the remaining 43% is flat or rolling.The Ultra X Scotland 110K course runs 68.4 mi with 9,580 ft of climbing and 9,547 ft of descent - 140 ft of climbing per mile. It tops out at 1,424 ft, and its lowest point on the GPX is 49 ft. 29% of the distance climbs at more than 3%, 28% descends at more than 3%, and the remaining 43% is flat or rolling.

The organiser's 11 checkpoints split the course into 11 sections. The table gives each leg's own climb, descent, average grade and high point, measured on the official GPX.

Download the official GPX
Ultra X Scotland 110K: each section between two checkpoints, with its climb, descent, grade and high point measured on the official GPX
Section KmMi Distance D+ D- Avg grade High point
Start - Queens Park Stadium, Inverness → CP1 Great Glen layby 0.0-9.00.0-5.6 9.0 km5.6 mi +332 m+1,089 ft -12 m-39 ft +3.5% 335 m1,099 ft
CP1 Great Glen layby → CP2 Abriachan 9.0-17.35.6-10.7 8.3 km5.2 mi +117 m+384 ft -101 m-331 ft +0.2% 351 m1,152 ft
CP2 Abriachan → CP3 Drumnadrochit 17.3-27.810.7-17.3 10.5 km6.5 mi +121 m+397 ft -435 m-1,427 ft -3.0% 381 m1,250 ft
CP3 Drumnadrochit → CP4 Grotaig 27.8-35.217.3-21.9 7.4 km4.6 mi +243 m+797 ft -109 m-358 ft +1.8% 267 m876 ft
CP4 Grotaig → CP5 Invermoriston 35.2-50.021.9-31.1 14.8 km9.2 mi +576 m+1,890 ft -658 m-2,159 ft -0.6% 427 m1,401 ft
CP5 Invermoriston → CP6 Fort Augustus 50.0-63.031.1-39.1 13.0 km8.1 mi +406 m+1,332 ft -355 m-1,165 ft +0.4% 141 m463 ft
CP6 Fort Augustus → CP7 Loch Tarff 63.0-71.039.1-44.1 8.0 km5.0 mi +379 m+1,243 ft -181 m-594 ft +2.5% 434 m1,424 ft
CP7 Loch Tarff → CP8 Wildside 71.0-80.044.1-49.7 9.0 km5.6 mi +51 m+167 ft -234 m-768 ft -2.0% 339 m1,112 ft
CP8 Wildside → CP9 Farigaig 80.0-94.049.7-58.4 14.0 km8.7 mi +493 m+1,617 ft -434 m-1,424 ft +0.4% 215 m705 ft
CP9 Farigaig → CP10 Whitefield 94.0-104.058.4-64.6 10.0 km6.2 mi +335 m+1,099 ft -365 m-1,198 ft -0.3% 325 m1,066 ft
CP10 Whitefield → Finish - Dores 104.0-110.064.6-68.4 6.0 km3.7 mi +39 m+128 ft -204 m-669 ft -2.7% 213 m699 ft

The climbs that shape the race

The track holds 9 major climbs and 8 major descents. The biggest climb runs from km 0 to km 9 (Start - Queens Park Stadium, Inverness to CP1 Great Glen layby): +341 m over 9.3 km at an average of 3.4%. The steepest sustained climb averages 7.4% over 2.0 km from km 39, with pitches of 25.2%. 3 of the major climbs start in the last 30% of the course. The longest descent drops 359 m over 11.3 km from km 69 (through CP7 Loch Tarff), at an average of 2.5%.The track holds 9 major climbs and 8 major descents. The biggest climb runs from mile 0 to mile 6 (Start - Queens Park Stadium, Inverness to CP1 Great Glen layby): +1,119 ft over 5.8 mi at an average of 3.4%. The steepest sustained climb averages 7.4% over 1.3 mi from mile 24, with pitches of 25.2%. 3 of the major climbs start in the last 30% of the course. The longest descent drops 1,178 ft over 7.0 mi from mile 43 (through CP7 Loch Tarff), at an average of 2.5%.

Distance, total climb and high point are the organiser's. Each section's climb, descent, grade and high point, the low point and the named climbs are measured on the official GPX with the same method as the interactive profile, so the sections can add up to a slightly different total.